Rates & Fees

Primary Residential

Basic Facilities $25.00 /mo
NC Renewable Energy Recovery Fee $0.36 /mo
Energy Efficiency Rider $1.55 /mo
Electric Charge 12.9¢ /KWH

Secondary Residential

Basic Facilities $20.00 /mo
NC Renewable Energy Recovery Fee $0.36 /mo
Energy Efficiency Rider $1.55 /mo
Electric Charge 12.9¢ /KWH

Residential FlexPay

Basic Facilities $0.83 /day
NC Renewable Energy Recovery Fee $0.012 /day
Energy Efficiency Rider $0.052 /day
Electric Charge 12.9¢ /KWH
Transaction Fee $1.50 /pmt
Note: Daily FlexPay charges are equivalent to monthly Primary Residential charges.

The “Purchase Power Fuel Charge” is a charge that covers the cost of the fuel that Duke Energy, our electricity provider, uses to generate electricity. The fuel generation could be any source, such as natural gas, coal, nuclear, diesel, solar, wind, hydro, etc. This charge fluctuates from month to month depending on the price and the mix of fuel.

The “Tax” is a utility tax on all items of the bill.
* NC tax rate is 7%
(All NC accounts are taxable except State or Federal accounts OR accounts that have been approved for State special manufacturing tax, which are exempt).
* TN tax rate varies:
* Residential, Churches, Schools, Organizations = 0%
* Small Commercial = 9.75% (7% state rate + 2.75% Unicoi rate)
* Large Power = 1.5%


Business Rates


Small Commercial Customer

Standard Business Fees

Basic Facilities Charge (single phase) $35.00 /mo
Basic Facilities Charge (3-phase) $60.00 /mo
NC Renewable Energy Recovery Fee $2.00 /mo
NC Energy Efficiency Rider -$5.65 /mo (Credit)
Electric Charge (First 3,000 KWH) 12.0¢ /KWH
Electric Charge (Over 3,000 KWH) 9.6¢ /KWH

The “Purchase Power Fuel Charge” is a charge that covers the cost of the fuel that Duke Energy, our electricity provider, uses to generate electricity. The fuel generation could be any source, such as natural gas, coal, nuclear, diesel, solar, wind, hydro, etc. This charge fluctuates from month to month depending on the price and the mix of fuel.

The “Tax” is a utility tax on all items of the bill.
* NC tax rate is 7%
(All NC accounts are taxable except State or Federal accounts OR accounts that have been approved for State special manufacturing tax, which are exempt).
* TN tax rate varies:
* Residential, Churches, Schools, Organizations = 0%
* Small Commercial = 9.75% (7% state rate + 2.75% Unicoi rate)
* Large Power = 1.5%


Large Power Customer

*Demand = maximum kilowatts a business requires at peak usage

Standard Business Fees

Basic Facilities Charge (50KW - 1000KW)$60.00 /mo
Basic Facilities Charge (Over 1000KW)$250.00 /mo
Renewable Energy Fee$13.31 /mo
Energy Efficiency Rider-$5.65 /mo (Credit)

Demand: 50 – 1,000 KW

Demand Charge$13.00 /KW
Energy Charge (First 400 hrs)7.7¢ /KWH
Energy Charge (Over 400 hrs)7.1¢ /KWH

Demand: > 1,000 KW

Demand Charge$13.60 /KW
Energy Charge (First 475 hrs)7.0¢ /KWH
Energy Charge (Over 475 hrs)6.2¢ /KWH

Demand usage of more than 400 hours is 6.2 cents per KWH.  Hours are calculated as kwh ÷ KW.

The “Purchase Power Fuel Charge” is a charge that covers the cost of the fuel that Duke Energy, our electricity provider, uses to generate electricity. The fuel generation could be any source, such as natural gas, coal, nuclear, diesel, solar, wind, hydro, etc. This charge fluctuates from month to month depending on the price and the mix of fuel.

The “Tax” is a utility tax on all items of the bill.
* NC tax rate is 7%
(All NC accounts are taxable except State or Federal accounts OR accounts that have been approved for State special manufacturing tax, which are exempt).
* TN tax rate varies:
* Residential, Churches, Schools, Organizations = 0%
* Small Commercial = 9.75% (7% state rate + 2.75% Unicoi rate)
* Large Power = 1.5%

Lighting Service Rates

Security Lights

100-175 Watt $10.00 /mo
400 Watt (Existing fixtures only) $18.00 /mo

Street Lights

100-175 Watt Mercury Vapor/LED $10.00 /mo
400 Watt Mercury Vapor (Existing fixtures only) $18.00 /mo
250 Watt Lucalux Sodium Vapor $16.00 /mo
400 Watt Lucalux Sodium Vapor $18.00 /mo

Generation Rates

Residential Generation

Basic Facilities Charge $20.00 /mo
Generation Credit 4.4¢ /KWH
Interconnection Fee (One-time fee) $200.00

Commercial Generation

Basic Facilities Charge (Single Phase) $30.00 /mo
Basic Facilities Charge (Three Phase) $40.00 /mo
Generation Credit 4.4¢ /KWH
Interconnection Fee (One-time fee) $200.00

Sell Excess Generation

Basic Facilities Charge (25kVA or less) $30.00 /mo
Electric Charge 12.9¢ /KWH
Generation Credit 4.4¢ /KWH
Interconnection Fee (One-time fee) $200.00

More Info

Since French Broad Electric Cooperative is a nonprofit organization, any money left over after paying all of its expenses in a given year is credited to member’s capital credit account. Click below to read more about what that means for you.

French Broad EMC has a late fee for any past due account. The fee is equal to 1.5% of the total past due amount with a $5.00 minimum and is compounded monthly.

The late fee was established in September 1st of 2010 after finding at least 35% of member accounts were past due during a period of twelve months. In the best interest of all our members we cannot afford to finance past due bills without this consequence.

The “Electric Charge” is a charge per kilowatt-hour used during the billing cycle. This charge is equivalent to the rate that is appropriate for the account in question.
* Residential (NC or TN)
* Commercial (NC or TN)
* Large Power (NC or TN)

The “Purchase Power Fuel Charge” is a charge that covers the cost of the fuel that Duke Energy, our electricity provider, uses to generate electricity. The fuel generation could be any source, such as natural gas, coal, nuclear, diesel, solar, wind, hydro, etc. This charge fluctuates from month to month depending on the price and the mix of fuel.

The “Basic Facilities Charge” is the fee that covers our costs to maintain and service the facilities which provide your residence the electrical service, such as the wire and transformer. It also covers the costs associated with reading the meter, processing the reading, creating and mailing the bill along with postage, and collecting and posting the payments. It is a set fee that applies to each meter on our system.

The “Tax” is a utility tax on all items of the bill.
* NC tax rate is 7%
(All NC accounts are taxable except State or Federal accounts OR accounts that have been approved for State special manufacturing tax, which are exempt).
* TN tax rate varies:
* Residential, Churches, Schools, Organizations = 0%
* Small Commercial = 9.75% (7% state rate + 2.75% Unicoi rate)
* Large Power = 1.5%

The “NC Renewable Energy Recovery Fee” is the fee that covers our costs to meet the renewable mandate requirements set forth in Senate Bill 3.
Click here for current fee
*Note: TN accounts are not charged.
*Note: This rate changes April 1st of each year.

The “NC Energy Efficiency Rider” is a fee that we charge to recover the costs associated with complying with the state mandated energy efficiency program.
Click here for current fee
*Note: TN accounts are not charged.
*Note: This rate changes April 1st of each year.

Consumer Deposit per Account

  • Residential: $500.00
  • Commercial: $500.00 or estimate of two month’s power bill when in full operation (whichever is greater)

**Deposit may be waived with approved letter of credit
**Deposit, plus interest, will be applied as credit to customer’s account after 12 consecutive months of on time payments

Service Charge (meter installation)

  • Normal Business Hours: $25.00 (plus tax)
  • After hours: $75.00 (plus tax)

Reconnect Fee (after disconnect for non-payment)

  • Normal Business Hours: $50.00 (plus tax)
  • After hours: $75.00 (plus tax)

Meter Tampering Fee

  • 1st Offense: $100.00 (plus tax)
  • 2nd Offense: $200.00 (plus tax)

**There may be additional charges for applicable reconnect fees and estimated unmetered power usage

OTHER FEES:

  • Non Automated Meter – Monthly Fee: $20 (plus tax)
  • Non Automated Meter – Missed Reading Fee: $250 (plus tax)
  • Meter Fee (for stolen or deliberately damaged meters): Between $150.00 & $235.00 (depending on meter type) plus tax
  • Metal Meter Cover: $7.50 (plus tax)
  • Glass Meter Cover: $6.50 (plus tax)
  • Meter Test Fee: $50.00 (plus tax) – Must be paid in advance
  • Returned Check Charge: $30.00
  • Security Light – (Connect/Reconnection/Relocation): $25.00 (plus tax)
  • Trip Charge: $250.00 (plus tax)
  • Fiber Fees: See Fiber Support For More Info

EMAIL WITH BILLING QUESTIONS

CALL WITH BILLING QUESTIONS

828-649-2051

OFFICE HOURS

8:00am – 4:30pm